The basis column is the right insight and it generalises well beyond PV — the objection is never to judgement, it is to judgement presented as measurement. One refinement worth adding to the four categories: split engineering judgement into judgement from comparable operating assets and judgement without a reference. Those are treated very differently in due diligence. A soiling assumption backed by two years of measured data from a plant 40 km away in similar conditions is close to a measurement in the reviewer's eyes; the same number with no reference is a discussion.
On ordering, I would move availability and curtailment out of the sequential chain and present them separately, because they are contractual and grid assumptions rather than energy-conversion losses. Keeping them in the multiplicative chain makes them look like physics, and reviewers then have to mentally extract them to test the contract. A chain that runs from irradiance through to AC energy at the meter, followed by a separate block for availability, curtailment and degradation, has consistently drawn fewer queries for me than a single flat list.