The drawings were coordinated and clean. One revision was needed after our architect changed a grid line late, which was handled as a change request with the cost stated up front rather than absorbed and argued about later.




Requirements to fab-ready outputs: schematic capture, controlled-impedance stack-up, layout with proper return paths, and a fabrication package that passes DFM at your chosen house.
The drawings were coordinated and clean. One revision was needed after our architect changed a grid line late, which was handled as a change request with the cost stated up front rather than absorbed and argued about later.
Complete deliverable set, properly revision-controlled, native files included as agreed. The handover call was genuinely useful rather than a formality.
The drawings were coordinated and clean. One revision was needed after our architect changed a grid line late, which was handled as a change request with the cost stated up front rather than absorbed and argued about later.
Complete deliverable set, properly revision-controlled, native files included as agreed. The handover call was genuinely useful rather than a formality.
3DaysRemoteMixed-Signal Engineering
3DaysOn-site availableMixed-Signal Engineering
2DaysOn-site availableRF Systems Engineering
4DaysRemoteASIC Engineering