The drawings were coordinated and clean. One revision was needed after our architect changed a grid line late, which was handled as a change request with the cost stated up front rather than absorbed and argued about later.




Bare-metal or RTOS firmware with drivers, a documented API and a unit test suite, written so the next engineer can maintain it without archaeology.
The drawings were coordinated and clean. One revision was needed after our architect changed a grid line late, which was handled as a change request with the cost stated up front rather than absorbed and argued about later.
Complete deliverable set, properly revision-controlled, native files included as agreed. The handover call was genuinely useful rather than a formality.
The drawings were coordinated and clean. One revision was needed after our architect changed a grid line late, which was handled as a change request with the cost stated up front rather than absorbed and argued about later.
Complete deliverable set, properly revision-controlled, native files included as agreed. The handover call was genuinely useful rather than a formality.
4DaysRemoteMixed-Signal Engineering
3DaysOn-site availableMixed-Signal Engineering
2DaysOn-site availableRF Systems Engineering
2DaysOn-site availableBattery Electronics Engineering