Find engineers who design, calculate and check work to ISRM Suggested Methods. The same engineering task can require completely different design standards by jurisdiction — which is why this is a structured field and not a keyword.
Nominating the standard is one of the highest-value things you can do in a brief. A design produced to the wrong code is not a design that needs adjusting — it is work that has to be redone, and the cost of finding that out late is entirely avoidable.
State ISRM Suggested Methods and your jurisdiction explicitly. The engineer should confirm the choice before starting and record it in the design basis, so every downstream check is traceable back to the clause it was made against.
Mine Ventilation Engineering specialist — mineral processing flowsheet & drill & blast design
3DaysRemoteMine Ventilation Engineering
6DaysRemoteMine Ventilation Engineering
4DaysRemoteMine Ventilation Engineering