Good work, and the documentation was better than we get from firms three times the size. Communication was slightly slow in the middle week but everything was recovered by the delivery date and we were kept informed.




Pushover or linear seismic assessment of an existing frame against current code demand, with a clear capacity-versus-demand table and a prioritised retrofit recommendation.
Good work, and the documentation was better than we get from firms three times the size. Communication was slightly slow in the middle week but everything was recovered by the delivery date and we were kept informed.
Handled a genuinely difficult failure investigation where two previous consultants had reached the wrong conclusion. Started from the evidence rather than from a hypothesis, and the root cause has held up — no recurrence since.
Good work, and the documentation was better than we get from firms three times the size. Communication was slightly slow in the middle week but everything was recovered by the delivery date and we were kept informed.
2DaysRemoteConstruction Engineering
6DaysRemoteConstruction Engineering
4DaysOn-site availableMunicipal Engineering
6DaysRemoteConstruction Methods Engineering