Good work, and the documentation was better than we get from firms three times the size. Communication was slightly slow in the middle week but everything was recovered by the delivery date and we were kept informed.




Scenario-by-scenario relief sizing to API 520/521 with a documented governing case per device and a consolidated flare load summary.
Good work, and the documentation was better than we get from firms three times the size. Communication was slightly slow in the middle week but everything was recovered by the delivery date and we were kept informed.
Handled a genuinely difficult failure investigation where two previous consultants had reached the wrong conclusion. Started from the evidence rather than from a hypothesis, and the root cause has held up — no recurrence since.
Good work, and the documentation was better than we get from firms three times the size. Communication was slightly slow in the middle week but everything was recovered by the delivery date and we were kept informed.
2DaysRemoteMaterials Process Engineering
2DaysRemote
5DaysRemoteProcess Piping Engineering
2DaysRemoteGas Processing Engineering