We hold land rights and a provisional grid connection offer for a 42 MWp plant. Topographic survey and a 12-month on-site met mast dataset are complete. We are moving to bankable design for a lender technical due diligence process.
We need a bankable design package — layout, yield, single-line diagrams and a grid compliance study — that will withstand a lender's independent engineer review.
| File | Type | Size | Access |
|---|---|---|---|
| Topographic survey | DWG | 88 MB | Released to invited engineers |
| 12-month met mast dataset | CSV | 14 MB | Released to invited engineers |
| Grid connection offer | 4 MB | NDA required | |
| Geotechnical report | 11 MB | NDA required | |
| Land boundary & exclusion zones | SHP | 6 MB | Released to invited engineers |
A milestone is accepted and paid when these are demonstrably met — not when it is merely submitted.
Submitted proposals are normalised into the same axes so they can actually be compared. The platform does not choose for the client — it makes the technical comparison transparent.
Lowest price is not automatically ranked first. Price sits alongside methodology, assumptions, verification and availability, because the cheapest proposal against an incomplete methodology is not the cheapest project.
Each match shows the evidence behind the score — and states what is missing rather than hiding it behind a rank.
We need a bankable design package — layout, yield, single-line diagrams and a grid compliance study — that will withstand a lender's independent engineer review.
We need a bankable design package — layout, yield, single-line diagrams and a grid compliance study — that will withstand a lender's independent engineer review.
We need a bankable design package — layout, yield, single-line diagrams and a grid compliance study — that will withstand a lender's independent engineer review.
We need production-intent schematic and layout with a fabrication package that passes DFM at our assembly house first time, and an antenna layout that actually achieves range.