We are adding a 120 tonne-per-day specialty intermediate line at an existing site. Lab and pilot data are complete. We need basic engineering to take to detailed design and procurement.
We need a converged process simulation, a heat and mass balance we can defend, a tagged P&ID set and equipment datasheets ready for enquiry.
| File | Type | Size | Access |
|---|---|---|---|
| Pilot plant data package | XLSX | 9 MB | NDA required |
| Existing site utility data | 5 MB | NDA required | |
| Plot plan | DWG | 12 MB | Released to invited engineers |
| Client drafting standard | 8 MB | Released to invited engineers | |
| Effluent consent limits | 1 MB | Public |
A milestone is accepted and paid when these are demonstrably met — not when it is merely submitted.
Submitted proposals are normalised into the same axes so they can actually be compared. The platform does not choose for the client — it makes the technical comparison transparent.
Lowest price is not automatically ranked first. Price sits alongside methodology, assumptions, verification and availability, because the cheapest proposal against an incomplete methodology is not the cheapest project.
Each match shows the evidence behind the score — and states what is missing rather than hiding it behind a rank.
We need a converged process simulation, a heat and mass balance we can defend, a tagged P&ID set and equipment datasheets ready for enquiry.
We need a converged process simulation, a heat and mass balance we can defend, a tagged P&ID set and equipment datasheets ready for enquiry.
We need a converged process simulation, a heat and mass balance we can defend, a tagged P&ID set and equipment datasheets ready for enquiry.
We need the full structural design package — analysis, member sizing, detailing and calculation report — produced to a standard our local reviewing engineer can check and sign without redoing the work.